Wind River Timberframes

01-02 Finished deck/Slab

When your subfloor deck or concrete slab is completed, the crew packs their tools and tents and head for the site.

Deliver 01-04

The timbers are covered by tarps and hauled by semi-truck to the job site. An extendable fork lift is used to unload and organize the timbers.

Camp 01-03

When it is possible, our crew prefers to camp on a job site. While the timbers are being unloaded, other crew members will be setting up tents, the kitchen wall tent, and the occasional hammock. This will be Wind River’s home for the duration of the project.